Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness
From MaRDI portal
(Redirected from Publication:319136)
Recommendations
- Scheduling identical parallel machines with a fixed number of delivery dates
- Scheduling on parallel identical machines to minimize total tardiness
- Scheduling parallel machines to minimize total weighted and unweighted tardiness
- Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
- Scheduling identical parallel machines to minimize total weighted completion time
- Scheduling jobs with sizes and delivery times on identical parallel batch machines
- Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs
- Due-date assignment and early/tardy scheduling on identical parallel machines
- Scheduling on uniform parallel machines to minimize maximum lateness
Cites work
- A tabu search algorithm for parallel machine total tardiness problem
- A tabu search heuristic for the generalized assignment problem
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Heuristics for the generalised assignment problem: Simulated annealing and tabu search approaches
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated production and distribution with fixed delivery departure dates
- Minimizing Total Tardiness on One Machine is NP-Hard
- Minimizing total tardiness in an unrelated parallel-machine scheduling problem
- Note on Shim and Kim's lower bounds for scheduling on identical parallel machines to minimize total tardiness
- Scheduling on parallel identical machines to minimize total tardiness
- Scheduling unrelated parallel machines to minimize total weighted tardiness.
- Scheduling with Fixed Delivery Dates
- Sequencing the processing of incoming mail to match an outbound truck delivery schedule
- Single machine scheduling with delivery dates and cumulative payoffs
- The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization
Cited in
(11)- Scheduling with Fixed Delivery Dates
- Scheduling parallel-machine batch operations to maximize on-time delivery performance
- Integrated production and transportation scheduling with order-dependent inventory holding costs
- Finding efficient make-to-order production and batch delivery schedules
- Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- Heuristic algorithm for lot sizing and scheduling on identical parallel machines
- Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints
- New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
- Scheduling identical parallel machines with a fixed number of delivery dates
This page was built for publication: Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q319136)