A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs
From MaRDI portal
(Redirected from Publication:319449)
Recommendations
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Min-max regret version of the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- A linear time-cost tradeoff problem with multiple milestones under a comb graph
- A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph
- Single-machine scheduling with trade-off between number of tardy jobs and compression cost
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 3225808 (Why is no real title available?)
- A network flow computation for project cost curves
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Concurrent Crashing and Overlapping in Product Development
- Critical Path Problems with Concave Cost-Time Curves
- Critical-Path Planning and Scheduling: Mathematical Basis
- Introduction to algorithms
- Optimum Time Compression in Project Scheduling
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Project scheduling. A research handbook.
- Resource-constrained project scheduling: Notation, classification, models, and methods
Cited in
(8)- Scheduling two projects with controllable processing times in a single-machine environment
- Considering project management activities for engineering design groups
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph
- A linear time-cost tradeoff problem with multiple milestones under a comb graph
- Min-max regret version of the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Simplifying the nonlinear continuous time-cost tradeoff problem
- Single-machine scheduling of multiple projects with controllable processing times
This page was built for publication: A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q319449)