Corrigendum to ``Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
DOI10.1016/J.EJOR.2015.06.022zbMATH Open1346.90297OpenAlexW2210483807MaRDI QIDQ319908FDOQ319908
Authors: Joaquín Bautista, Alberto Cano
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.06.022
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90) Dynamic programming (90C39) Production models (90B30)
Cited In (1)
This page was built for publication: Corrigendum to ``Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q319908)