Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation
DOI10.1016/J.EJOR.2015.06.004zbMATH Open1346.90076OpenAlexW1946320580MaRDI QIDQ319939FDOQ319939
Authors: Farshid Azadian, Ratna Babu Chinnam, Alper Murat
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.06.004
Recommendations
- Integrated production and transportation scheduling with order-dependent inventory holding costs
- Production and transport logistics scheduling with two transport mode choices
- Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders
- Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs
- An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90) Dynamic programming (90C39) Integer programming (90C10) Transportation, logistics and supply chain management (90B06) Production models (90B30)
Cites Work
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Validation of subgradient optimization
- Integrated machine scheduling and vehicle routing with time windows
- A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints
- Surrogate gradient algorithm for Lagrangian relaxation
- Integrated production and distribution operations: taxonomy, models, and review
- The complexity of the travelling repairman problem
- Convergence of the surrogate Lagrangian relaxation method
- Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach
- Scheduling jobs on parallel machines to minimize a regular step total cost function
- A robust optimisation model for aggregate and detailed planning of a multi-site procurement-production-distribution system
- Heuristics for the traveling repairman problem with profits
- Tabu search and lower bounds for a combined production-transportation problem
- Aggregate and detailed production planning integrating procurement and distribution plans in a multi-site environment
- An integrated aggregate and detailed planning in a multi-site production environment using linear programming
- Minimizing the weighted number of tardy jobs on a single machine with release dates
- Convergence and computational analyses for some variable target value and subgradient deflection methods
- Comments on ``Surrogate gradient algorithm for Lagrangian relaxation
- Profit-based latency problems on the line
- On the surrogate gradient algorithm for Lagrangian relaxation
Cited In (13)
- Scenario analysis-based decision and coordination in supply chain management with production and transportation scheduling
- New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
- Integrated production and transportation scheduling with order-dependent inventory holding costs
- A review of decentralized optimization focused on information flows of decomposition algorithms
- Solving the production transportation problem via a deterministic annealing neural network method
- Integrating production scheduling and transportation procurement through combinatorial auctions
- Integrated supply chain scheduling of procurement, production, and distribution under spillover effects
- Integrated scheduling of production and distribution for manufacturers with parallel batching facilities
- Integrated logistics planning for the air and space expeditionary force
- Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs
- Title not available (Why is that?)
- Production and transport logistics scheduling with two transport mode choices
- Production and logistics. Dedicated to Prof. Christoph Schneeweiß
This page was built for publication: Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q319939)