Scheduling pumpoff operations in onshore oilfields under electric-power constraints
From MaRDI portal
Publication:320129
DOI10.1016/J.EJOR.2015.06.001zbMath1346.90332OpenAlexW958673551MaRDI QIDQ320129
Eduardo Camponogara, Marco Aurélio Schmitz de Aguiar, Mateus Dubiela Oliveira
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.06.001
Integer programming (90C10) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Related Items (1)
Uses Software
Cites Work
- Mixed-integer linear optimization for optimal lift-gas allocation with well-separator routing
- A computational analysis of multidimensional piecewise-linear models with applications to oil production optimization
- Solving a gas-lift optimization problem by dynamic programming
- Branch-and-Price: Column Generation for Solving Huge Integer Programs
- Mixed-Integer Models for Nonseparable Piecewise-Linear Optimization: Unifying Framework and Extensions
- Decomposition Principle for Linear Programs
- A Linear Programming Approach to the Cutting-Stock Problem
- Unnamed Item
This page was built for publication: Scheduling pumpoff operations in onshore oilfields under electric-power constraints