Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
DOI10.1016/J.EJOR.2015.11.021zbMATH Open1346.90361OpenAlexW2178475976MaRDI QIDQ322689FDOQ322689
Authors: Stefan Kreter, Julia Rieck, Jürgen Zimmermann
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.11.021
Recommendations
scatter searchbinary linear model formulationscalendarsminimum and maximum time lagsresource-constrained project scheduling problem (RCPSP)
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Integer programming (90C10)
Cites Work
- PSPLIB -- a project scheduling problem library
- Network flows. Theory, algorithms, and applications.
- Title not available (Why is that?)
- Project scheduling with time-varying resource constraints
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- Scheduling of resource-constrained projects
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Solving RCPSP/max by lazy clause generation
- Perspectives in modern project scheduling.
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Title not available (Why is that?)
- Event-based MILP models for resource-constrained project scheduling problems
- Scatter search. Methodology and implementation in C. With CD-ROM.
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- Skilled workforce scheduling in service centres
- The project scheduling polyhedron: Dimension, facets and lifting theorems
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- Justification and RCPSP: a technique that pays
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Order-based neighborhoods for project scheduling with nonregular objective functions.
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- A scatter search algorithm for project scheduling under partially renewable resources
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
- A note on ``Event-based MILP models for resource-constrained project scheduling problems
- Calendarization of time planning in MPM networks
- Title not available (Why is that?)
- Title not available (Why is that?)
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- Project scheduling with calendars
- A competitive heuristic solution technique for resource-constrained project scheduling
- Complex system maintenance handbook
- A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem
Cited In (12)
- Integration of routing into a resource-constrained project scheduling problem
- Using constraint programming for solving RCPSP/MAX-cal
- Software project scheduling under activity duration uncertainty
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- Calendarization of time planning in MPM networks
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- Event-based MILP models for resource-constrained project scheduling problems
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications
- Title not available (Why is that?)
- Project scheduling with calendars
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
Uses Software
This page was built for publication: Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q322689)