Batching scheduling in a two-level supply chain with earliness and tardiness penalties
DOI10.1007/S11424-015-3330-YzbMATH Open1348.90613OpenAlexW2174210390MaRDI QIDQ328087FDOQ328087
Authors: Qi Wei, Erfang Shan, Liying Kang
Publication date: 20 October 2016
Published in: Journal of Systems Science and Complexity (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11424-015-3330-y
Recommendations
- Batch scheduling in a two-level supply chain -- a focus on the supplier
- Supply chain scheduling problems with setup times and batch scheduling
- Batch sizing and just-in-time scheduling with common due date
- Scheduling with batch setup times and earliness-tardiness penalties
- scientific article; zbMATH DE number 522739
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Dynamic programming in optimal control and differential games (49L20)
Cites Work
- Scheduling with batching: A review
- A survey of scheduling problems with setup times or costs
- Batching in single operation manufacturing systems
- Supply Chain Scheduling: Batching and Delivery
- Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties
- Production scheduling with supply and delivery considerations to minimize the makespan
- Due-date assignment and early/tardy scheduling on identical parallel machines
- A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem
- Integrated batch sizing and scheduling on a single machine
- Dynamic supply chain scheduling
- Batch scheduling in a two-level supply chain -- a focus on the supplier
- Sequencing with Earliness and Tardiness Penalties: A Review
Cited In (6)
- Batch scheduling in a two-level supply chain -- a focus on the supplier
- Cooperative game theory based coordinated scheduling of two-machine flow-shop and transportation
- A two stage scheduling with transportation and batching
- Title not available (Why is that?)
- Material allocation in MRP with tardiness penalties
- BATCH SCHEDULING IN CUSTOMER-CENTRIC SUPPLY CHAINS(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
This page was built for publication: Batching scheduling in a two-level supply chain with earliness and tardiness penalties
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q328087)