Batching scheduling in a two-level supply chain with earliness and tardiness penalties
From MaRDI portal
Publication:328087
DOI10.1007/s11424-015-3330-yzbMath1348.90613OpenAlexW2174210390MaRDI QIDQ328087
Erfang Shan, Qi Wei, Li-ying Kang
Publication date: 20 October 2016
Published in: Journal of Systems Science and Complexity (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11424-015-3330-y
Dynamic programming in optimal control and differential games (49L20) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39)
Cites Work
- Production scheduling with supply and delivery considerations to minimize the makespan
- Batching in single operation manufacturing systems
- A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem
- Scheduling with batching: A review
- Integrated batch sizing and scheduling on a single machine
- Dynamic supply chain scheduling
- A survey of scheduling problems with setup times or costs
- Batch scheduling in a two-level supply chain -- a focus on the supplier
- Sequencing with Earliness and Tardiness Penalties: A Review
- Supply Chain Scheduling: Batching and Delivery
- Due-date assignment and early/tardy scheduling on identical parallel machines
- Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties