Inequalities and Bounds in Stochastic Shop Scheduling
From MaRDI portal
Publication:3337205
Recommendations
- Inequalities for stochastic flow shops and job shops
- Inequalities and bounds for the scheduling of stochastic jobs on parallel machines
- A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine
- scientific article; zbMATH DE number 4099021
- Stochastically minimizing the makespan in flow shops
Cited in
(7)- Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops
- Inequalities for stochastic flow shops and job shops
- Inequalities and bounds for the scheduling of stochastic jobs on parallel machines
- scientific article; zbMATH DE number 4068593 (Why is no real title available?)
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- Makespan-related criteria for comparing schedules in stochastic environments
- A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine
This page was built for publication: Inequalities and Bounds in Stochastic Shop Scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3337205)