Interval Estimation After Sequential Testing Based on the Total Time on Test
DOI10.1287/OPRE.32.3.726zbMATH Open0553.62088OpenAlexW1990648427MaRDI QIDQ3347154FDOQ3347154
Authors: W. J. Padgett, L. J. Wei
Publication date: 1984
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.32.3.726
Recommendations
- scientific article; zbMATH DE number 3936287
- Sequential testing with interval censored data∗
- Exact calculation of the distributions of the stopping times of two types of truncated SPRT for the mean of the exponential distribution
- An acceptance life test for high-reliability products
- scientific article; zbMATH DE number 788244
total time on testlife testexponential caseaccurate confidence intervaltime truncated sequential procedure
Reliability and life testing (62N05) Applications of statistics in engineering and industry; control charts (62P30) Parametric tolerance and confidence regions (62F25) Sequential statistical analysis (62L10)
Cited In (3)
This page was built for publication: Interval Estimation After Sequential Testing Based on the Total Time on Test
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3347154)