Log Bucking and Lumber Manufacturing Using Dynamic Programming
From MaRDI portal
Publication:3347601
DOI10.1287/MNSC.30.2.245zbMATH Open0558.90039OpenAlexW2129543545MaRDI QIDQ3347601FDOQ3347601
Authors: Bruce Faaland, David A. Briggs
Publication date: 1984
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.30.2.245
Applications of mathematical programming (90C90) Dynamic programming (90C39) Production models (90B30)
Cited In (9)
- Usage of 3D geometry descriptions and transformation techniques in log bucking and curve sawing
- A hybrid constraint programming approach to a wood procurement problem with bucking decisions
- Secondary log breakdown optimization with dynamic programming
- Application of optimization for solving a sawing stock problem with a cant sawing pattern
- The log bucking problem: A comparison of dynamic programming versus branch and bound
- Title not available (Why is that?)
- Integrated defect detection and optimization for cross cutting of wooden boards
- Lumber production optimization
- Supply network planning in the forest supply chain with bucking decisions anticipation
This page was built for publication: Log Bucking and Lumber Manufacturing Using Dynamic Programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3347601)