Heuristic solution to the scheduling problems in flexible manufacturing system
From MaRDI portal
Publication:3354585
DOI10.1080/00207549108948064zbMath0729.90573OpenAlexW2025984232MaRDI QIDQ3354585
Bibekananda Maiti, Sandip Garg, Samar K. Mukhopadhyay
Publication date: 1991
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549108948064
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm ⋮ Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm ⋮ A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach ⋮ The classification of FMS scheduling problems ⋮ Priority-based tool allocation in a flexible manufacturing system
Cites Work