A heuristic algorithm to schedule work in the repair industry
From MaRDI portal
Publication:3354848
DOI10.1080/00207549108948091zbMath0729.90817OpenAlexW2032316650MaRDI QIDQ3354848
Sameer C. Jhaveri, Bobbie L. Foote
Publication date: 1991
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549108948091
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (1)
Cites Work
- Unnamed Item
- Optimal two- and three-stage production schedules with setup times included
- Optimal Tests for Initialization Bias in Simulation Output
- A survey and evaluation of static flowshop scheduling heuristics
- A Comparative Study of Flow-Shop Algorithms
- Optimal Elimination Methods in the m × n Flow-Shop Scheduling Problem
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A Functional Heuristic Algorithm for the Flowshop Scheduling Problem
This page was built for publication: A heuristic algorithm to schedule work in the repair industry