Optimizing designs and operations of a single network or multiple interdependent infrastructures under stochastic arc disruption
DOI10.1016/J.COR.2013.05.002zbMATH Open1348.90128OpenAlexW2043005199MaRDI QIDQ336602FDOQ336602
Authors: Siqian Shen
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.05.002
Recommendations
- Model and solution method for mean-risk cost-based post-disruption restoration of interdependent critical infrastructure networks
- Exploring recovery strategies for optimal interdependent infrastructure network resilience
- Integrating restoration and scheduling decisions for disrupted interdependent infrastructure systems
- Modeling interdependencies in infrastructure systems using multi-layered network flows
- Optimal power flow in distribution networks under \(N- 1\) disruptions: a multistage stochastic programming approach
stochastic optimizationpower systemsmixed-integer programmingcritical infrastructure analysiscutting-plane algorithmssystem interdependency
Stochastic programming (90C15) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06) Stochastic network models in operations research (90B15)
Cites Work
- A bilevel mixed-integer program for critical infrastructure protection planning
- Decomposition with branch-and-cut approaches for two-stage stochastic mixed-integer programming
- Introduction to Stochastic Programming
- Deterministic network interdiction
- Stochastic network interdiction
- Reformulation and sampling to solve a stochastic network interdiction problem
- The integer \(L\)-shaped method for stochastic integer programs with complete recourse
- A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
- Using mixed-integer programming to solve power grid blackout problems
- Optimization Strategies for the Vulnerability Analysis of the Electric Power Grid
- Computational risk management techniques for fixed charge network flow problems with uncertain arc failures
- Transmission Network Expansion Planning Under Deliberate Outages
- A bicriteria stochastic programming model for capacity expansion in telecommunications
- Multiperiod capacity expansion of a telecommunications connection with uncertain demand
- Robust capacity expansion of network flows
Cited In (10)
- Robust global sourcing under compliance legislation
- Modeling interdependencies in infrastructure systems using multi-layered network flows
- A two-stage resource allocation model for lifeline systems quick response with vulnerability analysis
- Using integer programming for balancing return and risk in problems with individual chance constraints
- Applying ranking and selection procedures to long-term mitigation for improved network restoration
- Sourcing decision under interconnected risks: an application of mean-variance preferences approach
- Computational risk management techniques for fixed charge network flow problems with uncertain arc failures
- Optimizing infrastructure network maintenance when benefits are interdependent
- A generic optimization framework for resilient systems
- Integrated reinforcement and repair of interdependent infrastructure networks under disaster-related uncertainties
This page was built for publication: Optimizing designs and operations of a single network or multiple interdependent infrastructures under stochastic arc disruption
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q336602)