Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
DOI10.1016/J.COR.2014.02.004zbMATH Open1348.90243OpenAlexW2018438060MaRDI QIDQ337029FDOQ337029
Hamid Allaoui, Saïd Hanafi, Abdelhakim Artiba, R. Ben-Mansour
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.02.004
Recommendations
- A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine
- Early-tardy minimization for joint scheduling of jobs and maintenance operations on a single machine
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
- Single machine scheduling to minimize weighted earliness subject to maximum tardiness
- Single-machine scheduling with fixed periodic preventive maintenance to minimise the total weighted completion times
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Scheduling
- Preemptive scheduling with availability constraints to minimize total weighted completion times
- Single-machine scheduling with periodic maintenance to minimize makespan
- Title not available (Why is that?)
- Benchmarks for scheduling on a single machine against restrictive and unrestrictive common due dates
- Sequencing with Earliness and Tardiness Penalties: A Review
- A single-machine scheduling problem with maintenance activities to minimize makespan
- Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times
- A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert
- Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
- Periodic-replacement models with threshold levels
- Title not available (Why is that?)
- Single machine weighted earliness-tardiness penalty problem with a common due date
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
Cited In (6)
- Early-tardy minimization for joint scheduling of jobs and maintenance operations on a single machine
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability
- General variable neighborhood search for the parallel machine scheduling problem with two common servers
- Variable neighborhood search for the single machine scheduling problem to minimize the total early work
- Scheduling preventive railway maintenance activities with resource constraints
- Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
This page was built for publication: Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q337029)