An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy
From MaRDI portal
(Redirected from Publication:337106)
Recommendations
- The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy
- The economic lot scheduling problem under power-of-two policy
- The economic lot scheduling problem under extended basic period and power-of-two policy
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies
- An improved algorithm for solving the economic lot size problem (ELSP)
Cites work
- scientific article; zbMATH DE number 1452995 (Why is no real title available?)
- 98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems
- A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- A global optimum search algorithm for the joint replenishment problem under power-of-two policy.
- A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case
- An integrated inventory-routing system for multi-item joint replenishment with limited vehicle capacity
- An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem.
- Computer Solutions of the Traveling Salesman Problem
- Coordination of production and distribution planning
- Distribution Strategies that Minimize Transportation and Inventory Costs
- Economic Lot Scheduling Problem with Raw Material Considerations
- Foundations of inventory management
- Industrial aspects and literature survey: Combined inventory management and routing
- Integrating Routing and Inventory Decisions in One-Warehouse Multiretailer Multiproduct Distribution Systems
- On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers
- One Warehouse Multiple Retailer Systems with Vehicle Routing Costs
- Planning and Scheduling in Manufacturing and Services
- Routing problems: A bibliography
- Synchronized development of production, inventory, and distribution schedules
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies
- The economic lot scheduling problem -- survey and LP-based method
- The economic lot scheduling problem under power-of-two policy
- The economic lot scheduling problem without capacity constraints
- The joint economic lot sizing problem: review and extensions
- The vehicle routing problem
Cited in
(7)- The economic lot scheduling problem under extended basic period and power-of-two policy
- A unified decomposition matheuristic for assembly, production, and inventory routing
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies
- The economic lot scheduling problem under power-of-two policy
- The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy
- A mathematical programming model for integrating production and procurement transport decisions
- A heuristic approach for determining lot sizes and schedules using power-of-two policy
This page was built for publication: An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q337106)