ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
DOI10.1016/J.COR.2014.05.013zbMATH Open1348.90287OpenAlexW2080786057MaRDI QIDQ337126FDOQ337126
Authors: Shih-Wei Lin, Kuo-Ching Ying
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.05.013
Recommendations
- An artificial bee colony algorithm for solving hybrid flow-shop scheduling problems with unrelated parallel machines
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
- A scheduling problem with unrelated parallel machines and sequence dependent setups
- A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem
- An improved discrete artificial bee colony algorithm for flexible flowshop scheduling with step deteriorating jobs and sequence-dependent setup times
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- An ant colony system for permutation flow-shop sequencing
- A state-of-the-art review of parallel-machine scheduling research
- Scheduling with deadlines and loss functions
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
- An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks
- Textile Production Systems: a Succession of Non-identical Parallel Processor Shops
- Particle swarm optimization algorithm for unrelated parallel machine scheduling with release dates
- Comparative performance analysis of artificial bee colony algorithm for automatic voltage regulator (AVR) system
Cited In (10)
- A new model and algorithm for uncertain random parallel machine scheduling problem
- Using PBIL to minimize makespan for parallel machines scheduling problem with job sequence dependent setup time
- Dynamic dispatching and preventive maintenance for parallel machines with dispatching-dependent deterioration
- Sensitivity analysis of the unrelated parallel machine scheduling problem with rework processes and machine eligibility restrictions
- The third comprehensive survey on scheduling problems with setup times/costs
- A makespan minimization problem for versatile developers in the game industry
- A hyper-heuristic for distributed parallel machine scheduling with machine-dependent processing and sequence-dependent setup times
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times
- Enhanced salp swarm algorithm based on firefly algorithm for unrelated parallel machine scheduling with setup times
- An improved discrete artificial bee colony algorithm for flexible flowshop scheduling with step deteriorating jobs and sequence-dependent setup times
This page was built for publication: ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q337126)