Capacitated Multi-Item Lot-Sizing Problems with Time Windows

From MaRDI portal
Publication:3392030


DOI10.1287/opre.1060.0325zbMath1167.90684MaRDI QIDQ3392030

Najib M. Najid, Nadjib Brahimi, Stéphane Dauzère-Pérès

Publication date: 13 August 2009

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.1060.0325


90C59: Approximation methods and heuristics in mathematical programming

90B30: Production models


Related Items

Variable neighborhood formulation search approach for the multi-item capacitated lot-sizing problem with time windows and setup times, Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator, Pricing for production and delivery flexibility in single-item lot-sizing, Erratum: a tight formulation for uncapacitated lot-sizing with stock upper bounds, Capacitated dynamic lot-sizing problem with delivery/production time windows, Polyhedral and Lagrangian approaches for lot sizing with production time windows and setup times, Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory, The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs, Capacitated disassembly scheduling under stochastic yield and demand, A polynomial time algorithm for the single-item lot sizing problem with capacities, minimum order quantities and dynamic time windows, Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories, Dynamic lot sizing with stochastic demand timing, Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty, A Lagrangian heuristic for capacitated single item lot sizing problems, Integrated production planning and order acceptance under uncertainty: a robust optimization approach, Dynamic capacitated lot-sizing problems: a classification and review of solution approaches, Lot-sizing with production and delivery time windows, Just-in-Time Planning and Lot-Sizing, Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales, Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over


Uses Software