Integrated bus transit scheduling for the Beijing bus group based on a unified mode of operation
From MaRDI portal
Publication:3393988
DOI10.1111/j.1475-3995.2009.00673.xzbMath1168.90351OpenAlexW1971938228WikidataQ93239177 ScholiaQ93239177MaRDI QIDQ3393988
Publication date: 28 August 2009
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: http://europepmc.org/articles/pmc7165575
Related Items (4)
Multi-objective integrated acyclic crew rostering and vehicle assignment problem in public bus transportation ⋮ Vehicle scheduling based on variable trip times with expected on-time performance ⋮ Railway crew scheduling: models, methods and applications ⋮ Public transit planning and scheduling based on AVL data in China
Cites Work
- Installing an urban transport scheduling system
- Staff scheduling and rostering: a review of applications, methods and models.
- Computer-aided systems in public transport. Selected papers based on the presentations at the 9th international conference, San Diego, CA, USA, August 9--11, 2004.
- Computer Solutions of the Traveling Salesman Problem
This page was built for publication: Integrated bus transit scheduling for the Beijing bus group based on a unified mode of operation