Solving software project scheduling problems with ant colony optimization
From MaRDI portal
Publication:339536
DOI10.1016/J.COR.2012.05.007zbMATH Open1349.90420OpenAlexW2021765132MaRDI QIDQ339536FDOQ339536
Authors: Jing Xiao, Xian-Ting Ao, Yong Tang
Publication date: 11 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.05.007
Recommendations
- scientific article; zbMATH DE number 2016119
- A modified ant colony algorithm for solving resource-constrained project scheduling problem
- Some aspects regarding the application of the ant colony meta-heuristic to scheduling problems
- Ant Colony System for JSP
- Dynamic multiobjective software project scheduling optimization method based on firework algorithm
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Ant colony optimization.
- Ant colony optimization for continuous domains
- Title not available (Why is that?)
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A hybrid metaheuristic for the resource-constrained project scheduling problem
- Staffing a software project: A constraint satisfaction and optimization-based approach
- A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
- Genetic algorithms for project management
Cited In (9)
- Dynamic vehicle routing with time windows in theory and practice
- Software project scheduling under activity duration uncertainty
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem
- Impacts of synergies on software project scheduling
- Multi-project scheduling problem under shared multi-skill resource constraints
- Dynamic multiobjective software project scheduling optimization method based on firework algorithm
- Title not available (Why is that?)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
This page was built for publication: Solving software project scheduling problems with ant colony optimization
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q339536)