A heuristic method for two-stage hybrid flow shop with dedicated machines
From MaRDI portal
(Redirected from Publication:339604)
Recommendations
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- A two-stage hybrid flow shop with dedicated machines at the first stage
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
Cites work
- scientific article; zbMATH DE number 5345853 (Why is no real title available?)
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
- A note on the two-stage hybrid flow shop problem with dedicated machines
- Comments on Flow shop and open shop scheduling with a critical machine and two operations per job
- Flow shop and open shop scheduling with a critical machine and two operations per job
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
- Modeling realistic hybrid flexible flowshop scheduling problems
- Optimal scheduling of a two-stage hybrid flow shop
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Scheduling two-stage hybrid flow shop with availability constraints
- Sequencing a hybrid two-stage flowshop with dedicated machines
- The hybrid flow shop scheduling problem
- Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage
Cited in
(20)- Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping
- A two-stage flow shop scheduling problem with transportation considerations
- A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
- On the two-stage hybrid flow shop with dedicated machines
- Méthode heuristique pour le problème de flow shop hybride avec machines dédiées
- Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry
- A comparison of priority rules for minimizing the maximum lateness in tree data gathering networks
- A branch-and-bound algorithm based on NSGAII for multi-objective mixed integer nonlinear optimization problems
- Scheduling a two stage proportionate flexible flow shop with dedicated machines and no buffers
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
- Clarifying cutting and sewing processes with due windows using an effective ant colony optimization
- A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines
- A two-stage hybrid flow shop with dedicated machines at the first stage
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
- Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Hybrid flow shop scheduling with not-all-machines options via local search with controlled deterioration
- Heuristic algorithms for two machine re-entrant flow shop
- A note on the two-stage hybrid flow shop problem with dedicated machines
This page was built for publication: A heuristic method for two-stage hybrid flow shop with dedicated machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q339604)