Models and hybrid methods for the onshore wells maintenance problem
DOI10.1016/J.COR.2012.02.026zbMATH Open1349.90340OpenAlexW1966187957MaRDI QIDQ339625FDOQ339625
Authors: Christophe Duhamel, Andréa Cynthia Santos, Lucas Moreira Guedes
Publication date: 11 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.02.026
Recommendations
- Scheduling workover rigs for onshore oil production
- A branch-price-and-cut algorithm for the workover rig routing problem
- A comparison of three metaheuristics for the workover rig routing problem
- A column generation model for a scheduling problem with maintenance constraints
- A hybrid algorithm for the drilling rig routing problem
Applications of mathematical programming (90C90) Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Mathematical programming (90C99)
Cites Work
- An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems
- The orienteering problem: a survey
- The vehicle routing problem
- The team orienteering problem
- Vehicle routing problem with elementary shortest path based column generation
- Solving a rich vehicle routing and inventory problem using column generation
- Improvements and extensions to Miller-Tucker-Zemlin subtour elimination constraints
- An exact algorithm for team orienteering problems
- An optimal solution procedure for the multiple tour maximum collection problem using column generation
- Scheduling workover rigs for onshore oil production
- Modeling the Mobile Oil Recovery Problem as a Multiobjective Vehicle Routing Problem
- A simple and efficient tabu search heuristic for solving the open vehicle routing problem
- The maximum collection problem with time-dependent rewards
Cited In (6)
- Scheduling workover rigs for onshore oil production
- A hybrid algorithm for the drilling rig routing problem
- A solution framework for the integrated periodic supply vessel planning and port scheduling in oil and gas supply logistics
- A branch-price-and-cut algorithm for the workover rig routing problem
- A solution framework for the integrated periodic supply vessel planning and port scheduling in oil and gas supply logistics
- A comparison of three metaheuristics for the workover rig routing problem
Uses Software
This page was built for publication: Models and hybrid methods for the onshore wells maintenance problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q339625)