A note on ``Two-machine flow-shop scheduling with rejection and its link with flow-shop scheduling and common due date assignment
From MaRDI portal
(Redirected from Publication:339677)
A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment
A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment
Recommendations
- Two-machine flow-shop scheduling with rejection
- New results on two-machine flow-shop scheduling with rejection
- Two-machine flow-shop scheduling with deterioration and rejection
- TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION
- A note on a due-date assignment on a two-machine flow-shop
- A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
- Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
- A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
- The two-machine flow-shop problem with weighted late work criterion and common due date
- Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
Cites work
- scientific article; zbMATH DE number 2109192 (Why is no real title available?)
- Enumeration of Pareto optima for a flowshop scheduling problem with two criteria
- Multicriteria scheduling. Theory, models and algorithms. Translated from the French by Henry Scott.
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling shops to minimize the weighted number of late jobs
- Single-machine scheduling under the job rejection constraint
- Two due date assignment problems in scheduling a single machine
- Two-machine flow-shop scheduling with rejection
Cited in
(4)
This page was built for publication: A note on ``Two-machine flow-shop scheduling with rejection and its link with flow-shop scheduling and common due date assignment