Dynamic routing strategies for JIT production in hybrid flow shops
From MaRDI portal
Publication:339696
DOI10.1016/J.COR.2012.04.022zbMATH Open1349.90293OpenAlexW2066519940MaRDI QIDQ339696FDOQ339696
Authors: Wei Weng, Xin Wei, Shigeru Fujimura
Publication date: 11 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.04.022
Recommendations
- scientific article; zbMATH DE number 1537217
- The just-in-time scheduling problem in a flow-shop scheduling system
- A comparative study of dispatching rules in dynamic flowshops and jobshops
- Routing with Early Ordering for Just-In-Time Manufacturing Systems
- New dispatching rules for shop scheduling: A step forward
Cites Work
- The hybrid flow shop scheduling problem
- A taxonomy of flexible flow line scheduling procedures
- Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
- Parallel machine earliness and tardiness scheduling with proportional weights
- Early/tardy scheduling with sequence dependent setups on uniform parallel machines
- Using dispatching rules for job shop scheduling with due date-based objectives
- Distributed feedback control algorithm for dynamic truck loading scheduling problem
- A differential evolution approach for the common due date early/tardy job scheduling problem
Cited In (2)
This page was built for publication: Dynamic routing strategies for JIT production in hybrid flow shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q339696)