Rescheduling rail networks with maintenance disruptions using problem space search
DOI10.1016/J.COR.2010.09.001zbMATH Open1349.90306OpenAlexW2077604954MaRDI QIDQ340231FDOQ340231
D. H. Lee, A. R. Albrecht, D. M. Panton
Publication date: 14 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.09.001
Recommendations
- Scheduling of railway track maintenance activities and crews
- Heuristic approach to train rescheduling
- scientific article; zbMATH DE number 2156303
- A heuristic approach to solving the train traffic re-scheduling problem in real time
- A MIP-based local search method for the railway rescheduling problem
Approximation methods and heuristics in mathematical programming (90C59) Deterministic network models in operations research (90B10) Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35)
Cited In (15)
- Improving the scheduling of railway maintenance projects by minimizing passenger delays subject to event requests of railway operators
- Scheduling of maintenance work of a large-scale tramway network
- Title not available (Why is that?)
- Timetable rearrangement to cope with railway maintenance activities
- Scheduling of railway track maintenance activities and crews
- On track procession assignment problem at the railway network sections
- An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems
- Problem space search metaheuristics with fix and optimize approach for the integrated fleet sizing and replenishment planning problem
- Integrating Robust Railway Network Design and Line Planning under Failures
- An integrated heuristic and mathematical modelling method to optimize vehicle maintenance schedule under single dead-end track parking and service level agreement
- Scheduling of maintenance windows in a mining supply chain rail network
- Rescheduling subway trains by a discrete event model considering service balance performance
- Generating train plans with problem space search
- On Time Selection for Track Possession Assignment at the Railway Station
- A new constraint programming approach for optimising a coal rail system
This page was built for publication: Rescheduling rail networks with maintenance disruptions using problem space search
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q340231)