Two-machine flowshop scheduling with flexible operations and controllable processing times
From MaRDI portal
Publication:340278
DOI10.1016/j.cor.2012.09.001zbMath1349.90404OpenAlexW2161074771MaRDI QIDQ340278
M. Selim Akturk, Zeynep Uruk, Hakan Gultekin
Publication date: 14 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/21102
Related Items (9)
Loading and scheduling for flexible manufacturing systems with controllable processing times ⋮ Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness ⋮ Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption ⋮ Batch scheduling of identical jobs with controllable processing times ⋮ Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption ⋮ Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence ⋮ Exact solution of the two-machine flow shop problem with three operations ⋮ Throughput optimization for the Robotic Cell Problem with Controllable Processing Times ⋮ Clarifying cutting and sewing processes with due windows using an effective ant colony optimization
This page was built for publication: Two-machine flowshop scheduling with flexible operations and controllable processing times