False Signal Rates for the (X) Control Charts with Runs Tests When Process Parameters Are Estimated
From MaRDI portal
Publication:3424314
DOI10.1080/03610910600880583zbMATH Open1105.62118OpenAlexW2092454999MaRDI QIDQ3424314FDOQ3424314
Authors: Chunyan Yang, Siu-Keung Tse, Guoying Li
Publication date: 15 February 2007
Published in: Communications in Statistics. Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610910600880583
Recommendations
- On the performance of modified runs rules charts with estimated parameters
- Are estimated control charts in control?
- Parameter estimation and design considerations in prospective applications of theX¯ chart
- Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning
- Run rules based phase II \(c\) and \(np\) charts when process parameters are unknown
Cites Work
Cited In (6)
- On the performance of modified runs rules charts with estimated parameters
- A test for suitability of the preliminary samples for constructing control limits of \(\bar X\) chart
- The Exact Run Length Distribution and Design of the Shewhart Chart with Estimated Parameters Based on Median Run Length
- A Simple Relation between the Pattern Probability and the Rate of False Signals in Control Charts
- Globally applicable control chart for online monitoring of stability of process mean
- Asymptotic properties of the estimators of the semi-parametric spatial regression model
This page was built for publication: False Signal Rates for the (X) Control Charts with Runs Tests When Process Parameters Are Estimated
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3424314)