Paint batching problem on M-to-1 conveyor systems
DOI10.1016/J.COR.2016.04.019zbMATH Open1349.90284OpenAlexW2342711390MaRDI QIDQ342469FDOQ342469
Authors: Sung-Seok Ko, Yong-Hee Han, Jin Young Choi
Publication date: 17 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2016.04.019
Recommendations
- A sequential ordering problem in automotive paint shops
- Accelerated dynamic programming algorithms for a car resequencing problem in automotive paint shops
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
- Sequencing jobs on an automobile assembly line: objectives and procedures
- Multiproduct batching and scheduling with buffered rework: the case of a car paint shop
dynamic programminggenetic algorithm\(M\)-to-1 conveyor systempaint batching problemre-sequencingsetup minimization
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Production models (90B30)
Cites Work
- An inexact algorithm for the sequential ordering problem
- Title not available (Why is that?)
- An Ant Colony System Hybridized with a New Local Search for the Sequential Ordering Problem
- Title not available (Why is that?)
- A sequential ordering problem in automotive paint shops
- Title not available (Why is that?)
- Title not available (Why is that?)
- Online Optimization of a Color Sorting Assembly Buffer Using Ant Colony Optimization
Cited In (3)
This page was built for publication: Paint batching problem on \(M\)-to-1 conveyor systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q342469)