scientific article; zbMATH DE number 4152127
From MaRDI portal
Publication:3481473
Recommendations
- Group technology inventories with optimal production costs
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.
- The G-group heuristic for single machine lot scheduling
- Grouping multi-item inventory using common cycle periods
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3481473)