scientific article; zbMATH DE number 4162638
From MaRDI portal
Recommendations
- Lot-size scheduling of two types of jobs on identical machines
- Job shop scheduling with alternative machines
- scientific article; zbMATH DE number 1839624
- Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions
- Optimal two- and three-stage production schedules with set-up time included
Cited in
(2)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3489780)