A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
From MaRDI portal
Publication:3496132
DOI10.1080/00207549108930045zbMath0711.90033MaRDI QIDQ3496132
Publication date: 1991
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549108930045
Related Items
Generic kanban systems for dynamic environments, Production planning for a multi-item, single-stage kanban system, Optimal numbers of two kinds of kanbans in a JIT production system, A review of optimisation models of Kanban-based production systems, The Kanban assignment problem -- A non-integral approach, Self-adapting WIP parameter setting using deep reinforcement learning, Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop., Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study, A genetic approach to Kanban assignment problems
Cites Work