Methods for optimum and near optimum disassembly sequencing
From MaRDI portal
Publication:3498871
DOI10.1080/00207540601120484zbMath1141.90404MaRDI QIDQ3498871
Surendra M. Gupta, Alfred J. D. Lambert
Publication date: 19 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601120484
optimization; heuristics; modelling; sequencing; disassembly; operational research; operations planning
90B30: Production models
Related Items
Capacitated disassembly scheduling under stochastic yield and demand, An asynchronous parallel disassembly planning based on genetic algorithm
Cites Work