Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling
From MaRDI portal
Publication:3498906
Recommendations
- A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation
- Modelling the load levelling problem in master production scheduling for MRP systems
- Multi-objective master production scheduling in make-to-order manufacturing
- A multi-stage stochastic programming approach in master production scheduling
- Capacitated lot sizing with alternative routings and overtime decisions
Cites work
- A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- An efficient genetic algorithm for job shop scheduling with tardiness objectives.
- Bottleneck-focused scheduling for a hybrid flowshop
- Due date assignment using artificial neural networks under different shop floor control strategies
- Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
- Rescheduling strategies for minimizing total weighted tardiness in complex job shops
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
- Scheduling in flowshops to minimize total tardiness of jobs
- The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure.
Cited in
(4)- Heuristic approaches for master planning in semiconductor manufacturing
- Earliness--tardiness production planning for just-in-time manufacturing: a unifying approach by goal programming
- A multi-stage stochastic programming approach in master production scheduling
- A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation
This page was built for publication: Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3498906)