Reliability analysis of two-unit cold standby repairable system with replaceable repaired facilities and delay in repair
From MaRDI portal
Publication:3501779
zbMATH Open1150.90364MaRDI QIDQ3501779FDOQ3501779
Authors: Jianxiong Gu, Yingyuan Wei
Publication date: 3 June 2008
Recommendations
- Two units cold standby repairable system with a replaceable repair facility and delay repair
- scientific article; zbMATH DE number 5631242
- scientific article; zbMATH DE number 800170
- Reliability Analysis of an n-unit Standby Repairable System with K Repair Facilities
- Reliability analysis of \(n\)-unit series systems with replaceable facilities and repair delay
Reliability and life testing (62N05) Reliability, availability, maintenance, inspection in operations research (90B25) Applications of renewal theory (reliability, demand theory, etc.) (60K10)
Cited In (14)
- Title not available (Why is that?)
- Reliability modeling of two-unit cold standby systems: a periodic switching approach
- Reliability measures and optimal maintenance policies for a standby system with repair facilities subject to breakdown
- Title not available (Why is that?)
- Title not available (Why is that?)
- Reliability Analysis of an n-unit Standby Repairable System with K Repair Facilities
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Reliability analysis of a renewable multiple cold standby system.
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Reliability analysis of a repairable system with randomly selected repairman and repair delay
This page was built for publication: Reliability analysis of two-unit cold standby repairable system with replaceable repaired facilities and delay in repair
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3501779)