Stronger upper and lower bounds for a hard batching problem to feed assembly lines
From MaRDI portal
Publication:3503545
DOI10.1016/J.ENDM.2008.01.028zbMATH Open1341.90021OpenAlexW2003104445MaRDI QIDQ3503545FDOQ3503545
Authors: Alexandre Salles da Cunha, Maurício C. de Souza
Publication date: 5 June 2008
Published in: Electronic Notes in Discrete Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.endm.2008.01.028
Recommendations
- Bounds for Assembly Line Balancing Heuristics
- An linear programming based lower bound for the simple assembly line balancing problem
- A dynamic program with fathoming and dynamic upper bounds for the assembly line balancing problem
- On the complexity of assembly line balancing problems
- Approximation Algorithms for the Assembly Line Crew Scheduling Problem
- scientific article; zbMATH DE number 4059101
- On lower and upper bounds for single machine parallel batch scheduling
- Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm
- Cost-oriented assembly line balancing: model formulations, solution difficulty, upper and lower bounds
Cites Work
Cited In (1)
This page was built for publication: Stronger upper and lower bounds for a hard batching problem to feed assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3503545)