scientific article; zbMATH DE number 5310692
From MaRDI portal
Publication:3518846
Recommendations
- Scheduling jobs on parallel machines with sequence-dependent setup times
- Scheduling unrelated parallel machines with sequence-dependent setups
- Scheduling parallel batching machines in a sequence
- Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
- Parallel Machine Scheduling with Batch Setup Times
- Parallel machine scheduling with precedence constraints and setup times
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers
- Scheduling on parallel machines considering job-machine dependency constraints
Cited in
(10)- An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times
- Scheduling multi-colour print jobs with sequence-dependent setup times
- Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint
- Loading and Sequencing on Parallel Machines
- Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
- The joint load balancing and parallel machine scheduling problem
- A desired load distribution model for scheduling of unrelated parallel machines
- AI 2005: Advances in Artificial Intelligence
- Answer-set programming for lexicographical makespan optimisation in parallel machine scheduling
- Robust scheduling of parallel machines with sequence-dependent set-up costs
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3518846)