Minimizing makespan and throughput times at Aalsmeer flower auction
From MaRDI portal
Publication:3545655
DOI10.1057/PALGRAVE.JORS.2602474zbMath1153.91447OpenAlexW1998856289MaRDI QIDQ3545655
No author found.
Publication date: 11 December 2008
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602474
Related Items (4)
Enhancing performance in order picking processes by dynamic storage systems ⋮ Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems ⋮ Batch picking in narrow-aisle order picking systems with consideration for picker blocking ⋮ Covering and connectivity constraints in loop-based formulation of material flow network design in facility layout
This page was built for publication: Minimizing makespan and throughput times at Aalsmeer flower auction