Cost-benefit analysis of a three unit standby system with delayed replacement, repair and post repair
From MaRDI portal
Publication:3589345
zbMATH Open1198.90097MaRDI QIDQ3589345FDOQ3589345
Authors: Rakesh Gupta, C. K. Goel, Archana Tomer
Publication date: 20 September 2010
Recommendations
- Cost-benefit analysis of two-unit cold standby system with the provision of rest to a unit
- Cost benefit analysis of 2-out of 3: \(G\) system with correlated failure and repair times
- A two priority unit warm standby system model with preparation for repair
- scientific article; zbMATH DE number 522728
- Stochastic analysis of a n-unit repairable system with slow switch
transition probabilityavailabilitymean sojourn timeregenerative pointMTSFdelayed replacementpost repairwarm and cold standbys
Cited In (4)
- Cost benefit analysis of 2-out of 3: \(G\) system with correlated failure and repair times
- Cost-benefit analysis of a computer system with priority to S/W replacement over H/W repair
- Cost benefit analysis of availability systems with warm standby units and imperfect coverage
- Cost benefit analysis of three systems with imperfect coverage and standby switching failures
This page was built for publication: Cost-benefit analysis of a three unit standby system with delayed replacement, repair and post repair
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3589345)