Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Subsection optimization on mixed model assembly lines based on workstation-constrained fast heuristic algorithm

From MaRDI portal
Publication:3609990
Jump to:navigation, search

zbMATH Open1174.90755MaRDI QIDQ3609990FDOQ3609990


Authors: Yan Liang, Ye Jin Edit this on Wikidata


Publication date: 6 March 2009





Recommendations

  • A method for mixed-model assembly line balancing problem
  • A balancing problem for mixed model assembly lines with a paced moving conveyor
  • Study on mix-model assembly line balancing with a hybrid genetic algorithm
  • Mixed model line balancing with parallel stations, zoning constraints, and ergonomics
  • ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations


zbMATH Keywords

heuristic algorithmmixed model assembly linessubsection optimization


Mathematics Subject Classification ID

Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27)







This page was built for publication: Subsection optimization on mixed model assembly lines based on workstation-constrained fast heuristic algorithm

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3609990)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3609990&oldid=17036281"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 5 February 2024, at 04:15. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki