Scheduling an Unbounded Batch Machine to Minimize Maximum Lateness
From MaRDI portal
Publication:3612587
DOI10.1007/978-3-540-73814-5_16zbMath1214.90048OpenAlexW1789061889MaRDI QIDQ3612587
Shuyan Bai, Fuzeng Zhang, Shuguang Li, Qi-Ming Liu
Publication date: 10 March 2009
Published in: Frontiers in Algorithmics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-540-73814-5_16
Related Items (1)
This page was built for publication: Scheduling an Unbounded Batch Machine to Minimize Maximum Lateness