Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over
From MaRDI portal
Publication:3636786
DOI10.1002/NAV.20345zbMATH Open1163.90509OpenAlexW2089578580MaRDI QIDQ3636786FDOQ3636786
Authors: Daniel Quadt, Heinrich Kuhn
Publication date: 29 June 2009
Published in: Naval Research Logistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20345
Recommendations
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Lot-sizing and scheduling for flexible flow lines.
- scientific article; zbMATH DE number 6129056
- A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times
- A heuristic procedure for the capacitated lot sizing problem with setup carry-over
Cites Work
- Lotsizing and scheduling for production planning
- A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
- Lot sizing and scheduling -- survey and extensions
- The general lotsizing and scheduling problem
- Simultaneous lotsizing and scheduling on parallel machines
- Capacitated lot-sizing with sequence dependent setup costs
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- Capacitated lot-sizing with extensions: a review
- A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
- The capacitated lot-sizing problem with linked lot sizes
- Computational Complexity of the Capacitated Lot Size Problem
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Lot-size models with backlogging: Strong reformulations and cutting planes
- The multi-item capacitated lot-sizing problem with setup times and shortage costs
- A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
- A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures
- On the polyhedral structure of a multi-item production planning model with setup times
- A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- A framework for modelling setup carryover in the capacitated lot sizing problem
- Heuristics for theN-product,M-stage, economic lot sizing and scheduling problem with dynamic demand
- Conceptual framework for lot-sizing and scheduling of flexible flow lines
- Modeling of period overlapping setup times
- Solving the capacitated lot-sizing problem with backorder consideration
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
- Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review
- An application of Lagrangean decomposition to the capacitated multi-item lot sizing problem
- Lot-sizing and scheduling for flexible flow lines.
- Algorithms for Capacitated, Multi-Item Lot-Sizing without Set-Ups
- Combining population-based and exact methods for multi-level capacitated lot-sizing problems
Cited In (15)
- Lot-sizing and scheduling for flexible flow lines.
- An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
- Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
- Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials
- Solving the capacitated lot-sizing problem with backorder consideration
- The setup carryover assignment problem
- A kernel search to the multi-plant capacitated lot sizing problem with setup carry-over
- A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding
- Conceptual framework for lot-sizing and scheduling of flexible flow lines
- Scheduling N Products On A Single Facility With Back-Ordering And Eixed Terminal Inventory
- Capacitated lot-sizing with extensions: a review
- Data-driven branching and selection for lot-sizing and scheduling problems with sequence-dependent setups and setup carryover
- A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Uses Software
This page was built for publication: Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3636786)