scientific article; zbMATH DE number 3825543
zbMATH Open0521.90058MaRDI QIDQ3670906FDOQ3670906
Authors: J.-C. Panayiotopoulos
Publication date: 1983
Title of this publication is not available (Why is that?)
simulation resultspolynomial timedemand and capacity constraintsfour step algorithmgeneralized heuristic techniquegeneralized multi-item lot size-schedulingNP-complete production planning
Applications of mathematical programming (90C90) Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cites Work
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- Title not available (Why is that?)
- Dynamic version of the economic lot size model
- Deterministic Production Planning: Algorithms and Complexity
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- Minimum Concave Cost Flows in Certain Networks
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- A Deterministic Multiproduct, Multi-Facility Production and Inventory Model
- An Implicit Enumeration Algorithm for the Concave Cost Network Flow Problem
- Production scheduling and sequencing for multi-stage production systems
- A Lower Bounding Structure for Lot-Size Scheduling Problems
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Considerations on the requirements matrix of a non-regular school time- table problem
Cited In (1)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3670906)