The flow shop problem with time lags and separated setup times
From MaRDI portal
Publication:3734157
DOI10.1007/BF01919496zbMath0598.90054MaRDI QIDQ3734157
Publication date: 1986
Published in: Zeitschrift für Operations Research (Search for Journal in Brave)
Related Items (2)
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints ⋮ Flowshop-scheduling problems with makespan criterion: a review
Cites Work
This page was built for publication: The flow shop problem with time lags and separated setup times