Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed
From MaRDI portal
Publication:3742567
DOI10.2307/1268762zbMath0605.62116MaRDI QIDQ3742567
Stephen B. Vardeman, Di-Ou Ray
Publication date: 1985
Full work available at URL: https://doi.org/10.2307/1268762
Poisson process; intensity; average run lengths; exponential CUSUM charts; exponentially distributed observations; fast-initial-response; Page equation
62P30: Applications of statistics in engineering and industry; control charts
Related Items
Simulating the average run length for cusum schemes using variance reduction techniques, Unified Solutions of Integral Equations of SPRT for Exponential Random Variables, The geometric CUSUM chart with sampling inspection for monitoring fraction defective, Performance of cumulative sum schemes for monitoring low count-level processes, On the average run lengths of quality control schemes using a Markov chain approach, Exact Determination of the Run Length Distribution of a One-Sided CUSUM Procedure Applied on an Ordinary Poisson Process, Exact average run lengths of cusum schemes for erlang distributions