A railway scheduling problem
From MaRDI portal
Publication:3754429
DOI10.1007/BF01919290zbMATH Open0617.90046OpenAlexW2015915829MaRDI QIDQ3754429FDOQ3754429
Peter Brucker, Johann L. Hurink
Publication date: 1986
Published in: Zeitschrift fรผr Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf01919290
Cites Work
Cited In (13)
- Periodic railway timetabling with event flexibility
- A genetic algorithm approach to periodic railway synchronization
- Title not available (Why is that?)
- Timetable rearrangement to cope with railway maintenance activities
- The problem of trains formation and scheduling: integer statements
- Scheduling periodic events
- The train marshalling problem
- Polygon scheduling
- A problem of scheduling operations at a locomotive maintenance depot
- Schedule synchronization for public transit networks
- Title not available (Why is that?)
- Knowledge-based system for railway scheduling
- Periodic network optimization with different arc frequencies
Recommendations
This page was built for publication: A railway scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3754429)