scientific article; zbMATH DE number 4001854
From MaRDI portal
Publication:3754430
zbMATH Open0617.90047MaRDI QIDQ3754430FDOQ3754430
Author name not available (Why is that?)
Publication date: 1986
Title of this publication is not available (Why is that?)
Recommendations
- Minimizing the number of late jobs for the two-machine unit-time job-shop scheduling problem
- Note on minimizing total tardiness in a two-machine flowshop
- Minimising Maximum Lateness in a Two-Machine Flowshop
- Minimizing the number of tardy jobs in two-machine settings with common due date
- Minmax due-date assignment on a two-machine flowshop
- Two-machine flow-shop scheduling to minimize total late work: revisited
- Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine
- Minimizing The Range Of Lateness On A Single Machine Under Generalized Due Dates
- Two-machine flowshop scheduling to minimize total tardiness
- A note on minimizing maximum lateness in a two-machine no-wait flowshop
Cited In (2)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3754430)