Optimal replacement in a shock model: discrete time
From MaRDI portal
Publication:3757114
DOI10.2307/3214082zbMath0621.60097OpenAlexW4237801135MaRDI QIDQ3757114
Publication date: 1987
Published in: Journal of Applied Probability (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2307/3214082
Markov renewal processes, semi-Markov processes (60K15) Applications of renewal theory (reliability, demand theory, etc.) (60K10)
Related Items
Optimal age-replacement policy of a system subject to shocks with random lead-time, A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times, A run shock-erosion model, The optimal replacement for additive damage models in discrete setting, Optimal preventive maintenance for equipment with two quality states and general failure time distributions, Optimal replacement for discrete additive damage models: Algorithm, On mixed censored \(\delta \)-shock models, Distributions of random variables involved in discrete censored δ-shock models, Determining the control limit policy in a replacement model with linear restoration, A Multi-Stage Two-Machines Replacement Strategy Using Mixture Models, Bayesian Inference, and Stochastic Dynamic Programming, Revisiting discrete time age replacement policy for phase-type lifetime distributions, Optimal replacement in a discrete time shock model., Life behavior of a system under discrete shock model, Reliability analysis of an extended shock model and its optimization application in a production line, A condition based maintenance model for a two-unit series system