Optimization of production planning problem with continuously distributed time-lags
From MaRDI portal
Publication:3758547
DOI10.1080/00207728608926903zbMath0621.90037OpenAlexW2000297585MaRDI QIDQ3758547
Publication date: 1986
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207728608926903
Production models (90B30) Production theory, theory of the firm (91B38) Inventory, storage, reservoirs (90B05) Numerical methods in optimal control (49M99)
Related Items (5)
Unnamed Item ⋮ Optimal production cycle time for inventory model with linear time dependent exponential distributed deterioration ⋮ On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time ⋮ Determining a common production cycle time for an economic lot scheduling problem with deteriorating items ⋮ Optimal control of the production–inventory system with deteriorating items and tradable emission permits
Cites Work
- Inventory planning in a deterministic environment: Continuous time model with concave costs
- Sufficient conditions for the optimal control of a class of systems with continuous lags
- Turnpike Horizons for Production Planning
- Perishable Inventory Theory: A Review
- Discrete Optimal Control of Production Plans
- Optimum Production Planning by the Maximum Principle
This page was built for publication: Optimization of production planning problem with continuously distributed time-lags