Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
From MaRDI portal
Publication:3765536
DOI10.1287/mnsc.33.1.95zbMath0628.90030MaRDI QIDQ3765536
Publication date: 1987
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/2027.42/8407
stochastic model; multi-echelon; serial production; optimal planned leadtimes; two stage serial systems
90B30: Production models
Related Items
Real-time due-date promising by build-to-order environments, Scheduling for stability in single-machine production systems, Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times, Manufacturing lead times, system utilization rates and lead-time-related demand, An optimal \((Q,r)\) policy for a multipart assembly system under stochastic part procurement lead times, A model of incentive contracts for just-in-time delivery, Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system, Lead times, order release mechanisms, and customer service, Lot sizing with random yields and tardiness costs, Manufacturing delivery performance for supply chain management, Production planning with load dependent lead times: An update of research, An explicit analysis of the lead time syndrome: stability condition and performance evaluation, An ordinal optimization based evolution strategy to schedule complex make-to-order products, Optimal supply planning in MRP environments for assembly systems with random component procurement times