A discounted machine-replacement model with an expected future technological breakthrough
From MaRDI portal
Publication:3780730
DOI<209::AID-NAV3220350206>3.0.CO;2-3 10.1002/1520-6750(198804)35:2<209::AID-NAV3220350206>3.0.CO;2-3zbMath0639.90039MaRDI QIDQ3780730
Zvi Goldstein, Shaul P. Ladany, Abraham Mehrez
Publication date: 1988
Full work available at URL: https://doi.org/10.1002/1520-6750(198804)35:2<209::aid-nav3220350206>3.0.co;2-3
hierarchical planning; single-stage manufacturing system; machine-replacement; purchasing, operating, and resale costs
90B25: Reliability, availability, maintenance, inspection in operations research
Related Items
A model for equipment replacement due to technological obsolescence, Maintenance optimal control three-machine replacement model under technological breakthrough expectations, Myopia and \(R\& D\)/production complementarities, Capacity planning with technology replacement by stochastic dynamic programming, Optimal selection of obsolescence mitigation strategies using a restless bandit model, A concave cost stochastic replacement problem., A concave cost multimachine replacement problem with an expected breakthrough., A Finite Horizon Dynamic Programming Model for Production and Repair Decisions