Publication:3795467
From MaRDI portal
DOI<585::AID-NAV3220350411>3.0.CO;2-B 10.1002/1520-6750(198808)35:4<585::AID-NAV3220350411>3.0.CO;2-BzbMath0649.90055MaRDI QIDQ3795467
Timothy J. Lowe, Robert D. Plante, Richard T. Wong
Publication date: 1988
heuristics; gas turbine engine; nozzle assembly section; partitioning and sequencing problems; replacement of nozzle guide vanes
90B35: Deterministic scheduling theory in operations research
90B25: Reliability, availability, maintenance, inspection in operations research
Related Items
Selection and sequencing heuristics to reduce variance in gas turbine engine nozzle assemblies, Most and least uniform spanning trees
Cites Work